Darren

More work on Huntsman 65

by ARC on October 20, 2014

In the workshop today – work is progressing steadily on the Huntsman 65 Airstream.

Here you can see more work to repair the underbelly of the Airstream:

Airstream underbelly

In this picture the bathroom sections are being fitted in the bedrooom ensuite which also features a bespoke cocktail cabinet:

bedroom ensuite

Dave cuts one of the wall sections ready to fit:

dave working

Whilst Darren cuts the dark red interior aluminium skin:

Darren cuts the aluminium

{ 0 comments }

Exotic veneers for the Airstream lodges

by ARC on September 29, 2014

In the ARC workshop today the pair of Airstream lodges are really coming along, and the main focus of work has shifted to the interior where Darren and the team are fitting a selection of cabinets with some very interesting veneers.

Veneer cabinets in an Airstream

Veneer cabinets in an Airstream

Veneer cabinets in an Airstream

More polishing

15 April 2014

In the ARC workshop today – the Zilverline is still being polished! Here you can see Darren on the roof giving it the final touches – it’s nearly finished now, just in time for that spring sunshine!

Read the full article →

In the Workshop – finishing touches for this Airstream bar project

26 September 2013

In the workshop today the Airstream bar is receiving some finishing touches. Pictured above, Darren and our client Richard discuss fitting the coffee machine. Inside the bar has been fitted with a twinkling LED starry ceiling and colour changing LEDS. It also has carbon fibre doors and some colour changing LEDS on the outside too [...]

Read the full article →

Shelving is fitted in the Airstream Bar

4 September 2013

In the workshop today: Darren and Dave are still hard at work on the bar Airstream – here you can see them Scribing in, laminating and an interior cupboard, under construction…

Read the full article →

Keeping it in the Family

9 July 2013

In the workshop today – ARC is an family-run business and here we can see Darren’s son Luke is a chip off the old block as he helps polish this Airstream.

Read the full article →

Darren in action

22 June 2013

Here’s Darren using a specialist tool to manufacture new ribs for a serving hatch.

Read the full article →

In the workshop today cold but busy

28 March 2013

In the ARC Airstream workshop today, Selena and Darren are keeping warm by working hard on several Airstream projects – here’s a couple of action shots! A lot of Airstreams have come in for a spruce up or a service before the summer holidays and festival season.

Read the full article →

In the Workshop today – more Doom Bar

8 March 2013

In the Arc Workshop today – work is really progressing on the Doom Bar Airstream and now the taps are in you can really start to imagine how the finished trailer is going to look. Darren and the boys have been busy wiring in all of the electrics and lights and fitting the work surfaces [...]

Read the full article →

The Doom Bar Airstream takes shape

5 March 2013

In the workshop today: The Doom Bar Airstream project is really starting to take shape – with a serving hatch and bar area, work tops and storage and kitchen area.

Read the full article →